Raised storage areas (commonly called Mezzanine Floors) are a cost-effective way to increase your usable storage and office space. Our structural mezzanine floors are designed to achieve just this, and they are a much more affordable solution than moving premises. Plus, they are designed and fabricated in-house, right here in Australia.

Each one of our floors are free-standing, meaning they can be fabricated, installed, and be ready to use in a short amount of time. We have years of experience in constructing floors both small and large.

Benefits of Mezzanine Floors

Our mezzanine floors are a proven way of increasing the utility of your warehouse or office space but apart from just providing an easy, practical way of improving your current site without moving. Other benefits include:

  • Cost-effective construction. Mezzanine floors are quick to manufacture and construct making them a cost effective way of increasing your floor space, particularly when you compare to the cost of moving your business to a larger workspace.
  • Customisable. From heavy-duty storage to office spaces and breakout areas, mezzanine floors are highly customisable structures that can be tailored to your businesses specific needs.
  • Can be quickly constructed or removed. Due to the fact that mezzanine floors are manufactured off-site their installation is very efficient and because they are free-standing structures, requiring no need to be bolted into your floors or walls, they can be taken down quickly and without any permanent damage to your existing space.

Mezzanine Product Brochure [PDF]

 

- SWL : AS-1170
- Steel Structure Design: AS-4100 & 1554
- Fixed Platforms, Walkways, Stairways – Design, Construction & Installation: AS-1657

Width: 2400mm

Length: 6200mm

Height: 3000mm (2733mm Under Floor Clearance)

500kg per square metre

Assembly Beams: 250UB25.7
Support Purlins: C150.19 @400mm c/c
Support Columns: 89mm x 89mm x 5mm SHS
Base Plates: 250mm x 250mm x 16mm
Floor Connection Plates: 250mm x 250mm x 16mm
Perimeter Handrail: Galvanised ball and tube
Kickplate: 100mm x 100mm x 6mm equal angle
Flooring: 19mm tongue and groove plywood
Concrete Floor Load: 20 Mpa grade

Delivery

Six (6) to Eight (8) working weeks from receipt of deposit (Depending upon number of orders in a given month please ask at the point of ordering).

Site Inspections

Site inspections are welcome, should you wish to view product and work standards.

Product Warranty

Steelspan Storage Systems International Pty Ltd warrants that all products will be free from any defect in material or workmanship for a period of twelve (12) months from the date of delivery. If any products are supplied to the purchaser suffer defects within the warranty period, Steelspan Storage Systems International Pty Ltd will undertake to repair or replace in part or in whole defective products such that the products shall be of merchantable quality.

Steelspan Storage Systems International Pty Ltd shall not be liable for any defect or damage caused to any product after delivery to the purchaser.

Consequential Loss

Steelspan Storage Systems International Pty Ltd shall not be under any liability and will take no responsibility to the customer in respect of loss of profits, anticipated savings, wasted expenditure, corruption or destruction of data, goodwill or any type of special, indirect or consequential loss which may be suffered or incurred or which may arise directly or indirectly in respect of the supply of products and/or services herein or the failure or omission by Steelspan Storage Systems International Pty Ltd to comply with this quotation.

Concrete floor finishing

If you are intending on having a high finish concrete floor in your warehouse area where the mezzanine is being located, such as a painted finish or concrete polishing, please have this done after the installation of the mezzanine. As mezzanine installation requires the moving around and handling of large and heavy structural steel items if the floor has been done prior to the installation of the mezzanine all care will be taken but we cannot guarantee no marking of the floor.

Cancellations

Due to the heavy engineering specialisation and detailed work requirements of the ordered products, cancellation of orders after five (5) days from initial purchase will be subject to a twenty-five per cent (25%) penalty.

On-Site Delays

Steelspan Storage Systems International Pty Ltd reserves the right to invoice additional charges, at a proportionate rate, for any lost time (in excess of the first half hour) after arrival on site, where our service/installation crew is unable to undertake its work for reasons beyond our control (eg area not cleared or forklift unavailable etc).

Certification

Certification of structural adequacy will be made available on completion of works and supplied as per our terms and conditions.

Client Responsibilities

A site clear of all obstructions, including other trades.

Access to 240V AC power outlets (maximum distance 50 meters).

Adequate lighting.

Normal site services such as toilets, washing facilities and first aid, are made available.

That all work be carried out within normal weekday working hours. Overtime or weekend work will be charged as an extra at the appropriate rate.

That any new material required, other than what has been specified, would be charged as an extra.

That security of all equipment, once delivered, to be arranged by the purchaser.

There are no allowances made for any external approvals.

Evaluation of existing concrete floor and concrete all load capacities.

Hot Works permit and Isolation of Smoke detectors and Fire alarms as and if required.

A forklift truck made available for movement of products. Option to hire forklift on checkout with delivery options.

Disposal of Rubbish (Building materials offcuts).

Earthquake seismic factor is not incorporated into our static calculations.

General Terms and Conditions

Acceptance of this quotation/tax invoice automatically constitutes acceptance of Steelspan Storage Systems Terms and Conditions available at www.steelspan.com.au

Shipping and Installation: Items are supplied unassembled unless assembly and installation is selected at checkout.

For palletised orders, where onsite forklift is not available, delivery is to kerbside only.

An authorised signatory needs to be at the delivery address to sign for and collect the goods, and that photo identification may be requested.

Discarding of pallet and packaging is the responsibility of the receiver.

Additional charges may apply in the following circumstances: where orders are redirected to an alternative address, where redelivery is required, where street or property access is limited. Some larger items may incur a ‘bulky or heavy item’ delivery charge. If our freight costs are substantially higher, we will contact you within 2 business days to discuss an additional delivery charge.

A full refund will be issued if you choose not to accept the additional charge. Assembly and Installation includes free-standing shelving, cabinet and Module products only. Unless otherwise stated floor and wall fixing is not included. Contact us for pricing on installation and fixing of products requiring floor and wall fixing.

Whilst every care will be taken when delivering and installing our products, liability will not be accepted for accidental damage to property.

Returns: A restocking fee and associated return shipping costs may be incurred where the goods are rejected without due cause.

Featured collections

Explore our wide range of storage products.